§ 75.1432. Initial measurement.
85 words·~1 min read·
/us/cfr/t30/s§ 75.1432·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
After initial rope stretch but before visible wear occurs, the rope diameter of newly installed wire ropes shall be measured at least once in every third interval of active length and the measurements averaged to establish a baseline for subsequent measurements. A record of the measurements and the date shall be made by the person taking the measurements. This record shall be retained until the rope is retired from service. \[48 FR 53239, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995\]
Connections1 cite this
Cited by 1 section
Citation graph
cites case law
§ 75.1432
Initial measurement.
Fed. Reg.×1
Cites 0Cited by 1 across 1 source